FAQ — Custom Kitchen Questions Answered | Doig Woodwork
— FAQ

What we're often asked.

How long does a full project take?+

From preliminary quote to final install, a Kitchen A takes 6-8 weeks. A Kitchen AA takes 8-12 weeks. A Kitchen AAA can take 12-20 weeks depending on complexity and materials.

Do you work in San Diego or only Tijuana?+

Yes, we work on both sides of the border. Our workshop is in Tijuana, and we service projects in San Diego, Tecate, Rosarito, and Ensenada. For non-local projects we quote protected shipping.

Can I pay in installments?+

In addition to the base 30/30/30/10 plan, we offer a 6 or 9 month payment program depending on project size. Ask during quoting.

What materials do you use for cabinets?+

The structure uses 3/4" Baltic Birch with a transparent seal — resistant to odors and humidity. For fronts, Arauco and Vesto melamines, or woods like Birch, Oak, and Walnut depending on tier.

Is the hardware new?+

All hardware is 100% new. Soft-close hinges and rails come standard on every job. Blum hardware and push mechanisms available on request.

Can I visit the workshop?+

Yes, we schedule workshop visits during the design phase. It's something our clients really value — seeing where and how your kitchen is being built.

What warranty do you offer?+

Free 1-year service on stability, paint damage, and hardware failures. The full warranty policy is included as an annex in your quote.

— Next step

Book a visit.

No commitment. We come out, measure, listen, and hand back a preliminary quote.

Doig