What we're often asked.
From preliminary quote to final install, a Kitchen A takes 6-8 weeks. A Kitchen AA takes 8-12 weeks. A Kitchen AAA can take 12-20 weeks depending on complexity and materials.
Yes, we work on both sides of the border. Our workshop is in Tijuana, and we service projects in San Diego, Tecate, Rosarito, and Ensenada. For non-local projects we quote protected shipping.
In addition to the base 30/30/30/10 plan, we offer a 6 or 9 month payment program depending on project size. Ask during quoting.
The structure uses 3/4" Baltic Birch with a transparent seal — resistant to odors and humidity. For fronts, Arauco and Vesto melamines, or woods like Birch, Oak, and Walnut depending on tier.
All hardware is 100% new. Soft-close hinges and rails come standard on every job. Blum hardware and push mechanisms available on request.
Yes, we schedule workshop visits during the design phase. It's something our clients really value — seeing where and how your kitchen is being built.
Free 1-year service on stability, paint damage, and hardware failures. The full warranty policy is included as an annex in your quote.
Book a visit.
No commitment. We come out, measure, listen, and hand back a preliminary quote.